2
If the load which needs to be delivered on a route has two segments (for example, address A to address B and then address B to address C), system generates two estimated freight bills even though same carrier is serving both the segments.
Expected result: System should generate only one estimated freight bill if the carrier remains same for all the segments on a route.
STATUS DETAILS
New
Comments
I'm up to you
Category: Transportation Management